Project Overview
Intego Group was tasked with recreating the real-life scenario of installing new equipment on existing offshore oil rigs. To design exact virtual copies of these rigs, the software engineers had to develop a special algorithm to import CAD models of real parts of the rig, as well as consider other parameters and environmental factors. The goal was to employ these specifications in a 3D model to find the best possible combination for training the team before real-life installation took place.Client
Oil & Gas